Testimonials

Testimonial Testing

Details Page testing

teststs

asdfasdfasdf

Cosmo Luppino, Mechanical Engineering Manager Minelab Electronics:

"We were extremely pleased with the quality of the parts and from the rapid delivery. The biggest benefit for us was meeting our customer's delivery schedule"

Design Director, BAT Logic

“Being able to provide athletes with prototype products which they could use with confidence in racing and training, which exhibited the functional qualities of a final prouction product, helped us to make accurate and quick decisions for final tooling.   3D Systems Asia-Pacific (Formero) has been efficient and detailed with their handling of all aspects of our project and have delivered on their promises.“    

Bruce Sherriff, CEO, Just Water Solutions P/L

I finally found the right company to help bring my idea to a reality.  3D Systems Asia-Pacific's (Formero) experienced team worked with me every step of the way, from prototyping to developing an injection mould tool in China for ongoing mass production in Australia. 

Ray Hin, Engineering Manager, Zodiac Group Australia

"The project required a very tight tooling schedule to meet our product release date.  Formero's project management and commitment to our schedule ensured the product was relesed on time."

Medtronic

"With extremely small internal cavities that must be accurate and functional; no other 3D printer offered this."

Formero Client, Minesite Radio ICCL

Initially we chose Formero based on price and delivery of difficult tooling - numerous parts with overmoulds and very tight drafts -against a tight delivery schedule to market. Some 15 separate items were delivered in the promised time frame and were pretty much exact the first time around - their first off tooling is always impressive.  Compared to previous tool-makers used - Formero provided near perfect 1st time trial product in around 1/3 of the time.

General Manager, Product Development & Manufacturing, Nanosonics

Having a dedicated experienced Australian engineering team on the ground in Asia has been a huge advantage for us during product development, tool design and manufacturing stages.  Formero has done a great job delivering what we asked for within our timeframe and budget.

Engineering Manager, Zodiac Group Australia

The project required a very tight tooling schedule to meet our product release date.  Formero’s project management and commitment to our schedule ensured the product was released on time.

Cosmo Luppino, Mechanical Engineering Manager Minelab Electronics:

"We were extremely pleased with the quality of the parts and from the rapid delivery. The biggest benefit for us was meeting our customer's delivery schedule" 

Cullin Innovation:

"When the mechanism arrived I was blown away by the quality of the finish including the imbedded text and the accuracy of all ten components. The mechanism assembled correctly the first time and was tested to predict flow rates"

testimonial heading

details page

Testing the testimonial

test test

sdadafsd

safsasdhsfhkjdklajlkdjakljlfsj

hsdlfjldsjfljsdfljjdsfjlsdjljadlkjfkadsfkldj

hljdfsljldfjsajsfadjsdklfjlkajds

 

Case Study

testetst222

tesetstsfasdfafasdf asdfasdfas dfasfasdfs ss5555555


Go to Top